Home Link Sitemap Link DME International Link Contact Us Link
Corporate Profile Link Planning Your Project Link Customer Support Services Link Equipment Catalogue Link Natural Brew Link

Tuesday, Jun 21, 2011
Diversified Metal Engineering Ltd, (DME), celebrates 20 years in business with the company's 500th equipment installation.  
learn more



Monday, Oct 4, 2010
DME is pleased to welcome the following new breweries to our family of fine breweries.
learn more



Thursday, Sep 30, 2010
Toronto, ON, September 24, 2010- The 8th Annual Brewing Awards Winners were announced.  Among those receiving awards were the following breweries who brew using DME equipment.
learn more



News Link
Bookmark This Page Link Refer a Friend Link
Home: Planning Your Project: Fermentation Area

Fermentation Area

After brewing, the product is transferred to the fermentation area where it will be held from 14 to 28 days. The emphasis on this area should be on sanitation, such that all surfaces should be washable.

Carbon dioxide will be created and vented from this area. This area should also have a properly covered adequately pitched floor emptying into a trench drain run in front of the vessels.

Placement should also allow for access around the vessels. These vessels are normally connected to a coolant line and will require that the lines are properly supported from a wall or overhead.

All electrical outlets should have moisture resistant covers.

The distance from the brewhouse to the fermentation area should be kept to a minimum to allow for a direct transfer of product (through either flexible brewers hose or stainless steel hard piping).